Lesson title: 2D to 3D Truss Bridge Building
High School: Bridge Building Constraints
[NOTE: A pdf version of this page is available; see navigation box on the right.]
![]()  | 
| 
 Figure 1: From page 64 of Noyce, Pendred E, Engineering Bridges Connecting the World, Boston: Tumblehome, Inc., 2019  | 
Must be freestanding
- Bridge must not weigh more than __________*
 - Bridge must have a road that spans 8 inches long, 3 inches wide, and has guardrails on both side of the bridge
 - May only use the provided resources
 - Budget must not exceed $500,000
 - Must be able to support the weight of one or more of the following for 10 seconds without buckling
- Ten toy cars
 - Four block erasers
 
 
*Must be as close to the chosen patented design as possible*
Budget Sheet: Please see file
Materials Fees
- Construction Paper: $10,255 per sheet
 - Scissors: $15,000 per scissors
 - Tape: $50,000 per roll 9 (2 meters)
 - Ruler: $10,000
 
Construction Fees
- Labor Cost: 45,000 per person in group + $65.87 per minute worked
 
Disposal Fee:
- Construction Paper: $5,127.50 per sheet returned
 - Construction Paper: $2,563.75 per sheet; portion of sheet returned practices fee
 - Tape: $25,000 per roll returned
 