Scott Hall Progress Photos - December 2015-Campus Design and Facility Development - Carnegie Mellon University

Scott Hall Progress Photos - December 2015

12/23/15

Finishes including carpet, tile, ceiling tile, etc. are being installed within the North Wing.

Ceiling TileCeiling Tile

carpetceiling tile

restroomrestroom

Elevator installation is completed as shown below.

elevatorelevator

Rooftop mechanical equipment and utilities are installed.

rooftop MEPRooftop MEP

Green roof installation is ongoing at the cleanroom deck. Pavilion and Cafe curtainwall will be installed shortly.

paviliongreen roof

green roofgreen roof

MEP trades are installing pipes and ductwork within the cleanroom.

CleanroomCleanroom

12/3/15

Finishes, including carpet, tile, etc., are being installed within the North Wing as shown below.

TilingTilingFloor retro-plate

Wiremoldcarpet

Cafe MEP rough in has started and ductwork installation is 70% completed.

cafe rough incafe rough in

Cleanroom walls and concrete deck epoxy paint has started as shown below. Mechanical and electrical rough-in is started in the cleanroom.

cleanroom cleanroom

Equipment and utilities in the North Wing Main mechanical room, shown below left, are 90% installed. Air Handling Unit at the cleanroom mechanical room, shown below right, has been hung from the concrete deck and will be installed on a platform shortly.

North Wing Mechanical Roomcleanroom mechanical room

Green Roof installation is ongoing.

Green Roof Installation