9/27/2013

The lower manhole is being set within the excavation for the sanitary reroute.

110 107

108 109

9/20/2013

The temporary sanitary reroute within the courtyard has been installed.  This reroute diverts the sanitary away from the existing route while the new permanent line can be installed.

104 105 106

9/13/2013

Work on the shoring wall continues, while the storm/sanitary line within the courtyard is temporarily rerouted.  The storm/sanitary line will be permanently reouted after the excavation and shoring activities within the area are complete.

097 098

099 100 101

094 095 096

9/10/2013

A group of students from the School of Architecture who have based a construction practices course around the Scott Hall Project receive a tour of the site.