2016-01-06 Photos

Painting at A level of the Rotunda:

2016-01-06-image-001


Painting and installing carpet at A level of the Rotunda:

2016-01-06-image-002


Facing east at the First Floor of the Rotunda:

2016-01-06-image-003


Facing west at the First Floor of the Rotunda:

2016-01-06-image-004


Installation of the light fixtures at the 2nd Floor corridor:

2016-01-06-image-005


Installation of the Taktl panels and the planter on the roof of the New Classroom Addition:

2016-01-06-image-006


Construction area in the East Courtyard:

2016-01-06-image-007