Framing of the exterior walls on the first floor of the Rotunda:

2015-11-13-image-001


Framing of the ceiling and the exterior walls on A level of the Rotunda:

2015-11-13-image-002


Framing of the beams and the exterior walls on A level of the Rotunda:

2015-11-13-image-003


Installation of the Krion panels around the New Classroom Addition:

2015-11-13-image-004


Excavation and installation of the underground piping:

2015-11-13-image-011


Installation of the new roof on the Rotunda:

2015-11-13-image-006


Installation of handrail supports on the roof of the New Classroom Addition:

2015-11-13-image-007


Completion of the ADA entrance on Forbes Avenue:  

2015-11-13-image-008


Installation of drywall at the first floor entrance to the Rotunda:  

2015-11-13-image-009


Installation of drywall at the ceiling of the Rotunda:

2015-11-13-image-010