Southwest corner of the New Classroom Addition:

2015-07-17-image-001


Inside of the New Classroom Addition looking toward the west elevation of the Rotunda:

2015-07-17-image-002


Inside of the New Classroom Addition looking toward the west wall:

2015-07-17-image-003


East entrance of the New Classroom Addition:

2015-07-17-image-004

Roof of the New Classroom Addition facing west:

2015-07-17-image-005


Excavation for the new ADA entrance in Hamburg Hall:

2015-07-17-image-006


1st floor main corridor:

2015-07-17-image-007


Framing of the 1st floor west Toilet Room:

2015-07-17-image-008


Framing of the 1st floor east Toilet Room:

2015-07-17-image-009


Demolition of the 1st floor Rotunda:

2015-07-17-image-010


2nd floor corridor in the east wing of Hamburg Hall:

2015-07-17-image-011


Construction of the 2nd floor west Toilet Room:

2015-07-17-image-012


Construction of the 2nd floor east Toilet Room:

2015-07-17-image-013


2nd floor main corridor:

2015-07-17-image-014


Level A main corridor:

2015-07-17-image-015


Demolition of the A level Rotunda rooms:

2015-07-17-image-016


Demolition of the A level Rotunda:

2015-07-17-image-017