2015-06-26 Photos

South east corner of the New Classroom Addition:

2015-06-26-image-001


Inside of the New Classroom Addition facing toward the west wall:

2015-06-26-image-002


Inside of the New Classroom Addition facing toward the north wall:

2015-06-26-image-003


Inside of the New Classroom Addition facing toward the south wall:

2015-06-26-image-004


West entrance of the New Classroom Addition:

2015-06-26-image-005


Demolition of the east toilet room on the 2nd floor:

2015-06-26-image-006


Removal of the existing carpet in the main corridor of the 2nd floor:

2015-06-26-image-007


Demolition of the west toilet room on the 1st floor:

2015-06-26-image-008


Demolition of the Rotunda at the 1st floor:

2015-06-26-image-009


Demolition of the Rotunda at the 1st floor:

2015-06-26-image-010


Demolition of the east toilet room on the 1st floor:

2015-06-26-image-011


Pipe installation at the main corridor of Level A:

2015-06-26-image-012


Framing of the Control Room at Level A:

2015-06-26-image-013


Demolition of the rooms in the Rotunda at Level A:

2015-06-26-image-014


Demolition of the ceiling in the Rotunda at Level A:

2015-06-26-image-015