South east corner of the New Classroom Addition:

2015-06-19-image-001


Inside of the New Classroom Addition facing toward the west wall:

2015-06-19-image-002


Inside of the New Classroom Addition facing toward the west elevation of the rotunda:

2015-06-19-image-003


New Classroom Addition roof facing toward the west elevation of the rotunda:

2015-06-19-image-004


Installtion of the rainwater cistern:

2015-06-19-image-005


Demolition inside of the A level rotunda rooms:

2015-06-19-image-006


Demolition inside of the A level rotunda:

2015-06-19-image-007


Pipe installation at the main corridor of Level A:

2015-06-19-image-008


First floor main corridor:

2015-06-19-image-009


Demolition of the 1st floor west mechanical room:

2015-06-19-image-010


Demolition of the 1st floor west toilet room:

2015-06-19-image-011


Demolition of the 1st floor rotunda:

2015-06-19-image-012


Demolition of the 1st floor east toilet room:

2015-06-19-image-013


Demolition of the 2nd floor east toilet room:

2015-06-19-image-014


Demolition of the 2nd floor west toilet room:

2015-06-19-image-015