2015-01-08-photos-Campus Design and Facility Development - Carnegie Mellon University

2015-01-08 Photos

Demolition of the existing pavement in the courtyard between Hamburg Hall and Smith Hall:

2015-01-08-image-001

Excavation for the underground storm piping that will extend from the east wing of Hamburg Hall to the tie-in point at the Bio Retention:

2015-01-08-image-002

Bulk excavation beginning in the courtyard between Hamburg Hall and Smith Hall:

2015-01-08-image-003

Temporary fencing (to designate the egress path of pedestrians) and excavation spoils between the east wing of Hamburg Hall and Smith Hall:

2015-01-08-image-004